As your architectural practice scales, managing site research, municipal zoning, BIM coordination, consultant revisions, and documentation creates massive friction.
Inbound client enquiries come with vague requirements, missing site survey data, and fluctuating budgets, dragging out proposal cycles.
Senior architects spend hours combing through dense municipal bylaws, FAR/FSI restrictions, setback calculations, and heritage zone constraints.
Drafting repetitive door/window schedules, wall section specifications, and coordinating MEP clashes creates immense drafting fatigue.
Fragmented communication across structural engineers, MEP consultants, authorities, and client revision rounds causes multi-month project stalls.
Designing the building is only part of the job.
From automated zoning research & generative massing to intelligent BIM coordination, instant schedule generation, and municipal compliance tracking.
As your architectural practice scales, managing site research, municipal zoning, BIM coordination, consultant revisions, and documentation creates massive friction.
AI doesn't have to sit outside your architectural practice. It becomes the intelligent coordination layer connecting zoning research, generative massing, BIM models, and municipal documentation.
Conversational intake, plot survey extraction, and budget verification.
AI intake assistants collect site GIS coordinates, allowable typology, client programmatic requirements, and target milestones into a structured architectural charter.
"Commercial development brief logged: G+12 mixed-use tower. Plot: 4,200 sq.m. Target built-up area: 24,000 sq.m. Site coordinates & survey DWG ingested."
Automated municipal zoning checks, FAR calculations, and sun-path analysis.
AI cross-references municipal masterplans, setback rules, height restrictions, and local solar radiation data, outputting compliance envelope boundaries in minutes.
"Municipal code matched: NBC Zone 4. Max allowable FAR: 3.25. Permissible height: 45m. Setbacks: 6m front, 4.5m rear. Shadow study simulated for June solstice."
Parametric massing models, core layouts, and preliminary structural footprints.
AI generates multiple spatial configurations optimized for daylight penetration, structural efficiency, and floor plate flexibility for architectural design review.
"Option A: Twin-tower with sky-bridge (Net usable: 84%). Option B: Stepped atrium tower (Net usable: 81%, +15% daylight). Structural column grid aligned."
Continuous Revit/IFC synchronization and automated MEP clash detection.
AI monitors structural grid modifications, wall assemblies, and MEP duct routing, flagging interdisciplinary conflicts before they reach sanction review.
"Structural slab thickness updated to 250mm. AI detected 2 ductwork clashes on Level 4. Alternative routing proposed and synced to consultant models."
Instant door/window schedules, wall assemblies, and municipal submission sheets.
AI drafts accurate schedule sheets, area calculation statements, and municipal drawing sets directly from the coordinated 3D BIM model with zero manual re-entry.
"Full sanction package generated: 38 drawing sheets, door/window schedules, parking calculations, and NBC fire compliance report ready for upload."
Multi-disciplinary sign-offs, revision logs, and contractor site dossiers.
Automated revision comparison, digital consultant approval chains, and site contractor handover packs ensure seamless construction administration.
"Municipal building permit received. Final IFC execution drawings and contractor specification dossier dispatched to project construction team."
AI intake assistants collect site GIS coordinates, allowable typology, client programmatic requirements, and target milestones into a structured architectural charter.
Project Charter Formed
"Commercial development brief logged: G+12 mixed-use tower. Plot: 4,200 sq.m. Target built-up area: 24,000 sq.m. Site coordinates & survey DWG ingested."
AI cross-references municipal masterplans, setback rules, height restrictions, and local solar radiation data, outputting compliance envelope boundaries in minutes.
Zoning Envelope Calculated
"Municipal code matched: NBC Zone 4. Max allowable FAR: 3.25. Permissible height: 45m. Setbacks: 6m front, 4.5m rear. Shadow study simulated for June solstice."
AI generates multiple spatial configurations optimized for daylight penetration, structural efficiency, and floor plate flexibility for architectural design review.
3 Massing Schemes Generated
"Option A: Twin-tower with sky-bridge (Net usable: 84%). Option B: Stepped atrium tower (Net usable: 81%, +15% daylight). Structural column grid aligned."
AI monitors structural grid modifications, wall assemblies, and MEP duct routing, flagging interdisciplinary conflicts before they reach sanction review.
BIM Coordination Verified
"Structural slab thickness updated to 250mm. AI detected 2 ductwork clashes on Level 4. Alternative routing proposed and synced to consultant models."
AI drafts accurate schedule sheets, area calculation statements, and municipal drawing sets directly from the coordinated 3D BIM model with zero manual re-entry.
Submission Package Complete
"Full sanction package generated: 38 drawing sheets, door/window schedules, parking calculations, and NBC fire compliance report ready for upload."
Automated revision comparison, digital consultant approval chains, and site contractor handover packs ensure seamless construction administration.
Municipal Sanction Approved
"Municipal building permit received. Final IFC execution drawings and contractor specification dossier dispatched to project construction team."